Our Wishlist
Thank you for the recently received donations. Check out our progress below. There is still MUCH to be done. If you can help with donations, please let us know!
Inside Needs
Upstairs
- Finish rewiring of west side of building
- Install baseboards on south and west side
- Install central heating
- Remove loose plaster, finish all walls, and repaint
- Air conditioning COMPLETED but future upgrade may be needed
- Redo floor
- remove old wood floor
- install plywood sub floor over entire floor area
- install new wood floor over entire floor area
- New floor plan for more efficient use of space
- display space for artifacts and photographs PARTIALLY COMPLETED
- smaller kitchen area with stove
- file cabinet area
- computer area COMPLETED
- Install two or four ceiling fans with light kits
|
Downstairs
- Remove closet and remaining framing
- Remove bathroom
- Install new electrical box and wiring
- Install lights and spotlights to highlight graffiti
- Repair ceilings
- Renovate front room. Originally used as the office, in later years it was converted to a cell. Depending on
quality of graffiti, will be either an office again, or an exhibit cell like the other rooms.
- Replace two doors into other rooms
- Windows
- open up blocked windows
- replace three large and 6 small windows
- Replace bars on windows and doors
- Replace two outside doors PARTIALLY COMPLETED building is secure with modern door, would like period door in future
- Reconstruct at least one cell area for exhibit. Use other rooms for museum space.
|
Outside Needs
- Clean surface of building PARTIALLY COMPLETED
- Repair stucco
- Repair both landings with concrete finish
- Paint buildings and railings
- Replace east steps COMPLETED
- Replace railing on east landing
- Lay concrete slab to connect steps and ramp
- Build railing between ramp and steps
- Fill in/Close off lower steps on east side
- Repair retaining wall
- Remove and replace lower sidewalk with water run-off capability to north and west
- Seal seams in metal flashing at roof line COMPLETED
- Install lights on south side of building COMPLETED
- Do something about upper south doorway, currently blocked
- paint false door
- install old fashioned screen doors on both doorways
- Remove old fire escape (replace?) COMPLETED
- Replace turbine on roof
- Remove stucco from pillars; paint
- Install permanent sign at driveway
- Improve south parking lot, driveway; gravel circle drive
- Paint large sign over south doors
- Install permanent flag pole
- Landscape NEARLY COMPLETED
- Storage building on north end of lot
|
Furniture/Equipment Needs
Upstairs
- 4 lateral 3 drawer file cabinets
- 4 freestanding display boards
- 3 computer desks DONATED
- 2 computers DONATED
- 1 storage unit for cds, floppy discs, etc. DONATED
- 3 glass-door wall display units
- 1 podium with PA system
- 1 TV, 1 VCR, 1 DVD, 1 stereo DONATED
- 1 projector DONATED
- 6 4 ft. bookshelves REQUESTED
|
Downstairs
- Dehumidifier DONATED
- Wood desk and chair for sheriff's office
- Period window shades for office area
- Heating unit for downstairs DONATED
- Shelving for storage
- Glass-door wall display unit
- Period wood stove
- Security system for entire building DONATED
|
|
|